
This six month contract was awarded to Breffni Air on behalf of the main contractor Mace.
OffSite Build
A Modular metal framing system was erected in Cavan and transported onsite to Clonee. These containment systems feature a C-profile channel with serrated, open edges rolled inward during assembly and safely bolted into place on site.
The main advantage of this process is speed and accuracy for the client.
CONTRACT
Private Client, Clonee, Co. Meath
COMMENCEMENT
July 2017
COMPLETION
January 2018
REQUIREMENT
Modular Containment Solutions