Equinix

Project Brief
Supply and installation of DW144 under floor galvanised supply ductwork for server cooling. Supply ductwork consists of 20 separate systems spread over 2 floors and rising to a plant room and connecting to 20 AHUs.
Supply and installation of return ductwork for warm air extraction from data halls. Return ductwork consists of 20 separate systems spread over 2 floors and rising to a plant room and connecting to 20 AHUs. Return duct work within the risers are fire rated to act as a smoke exhaust system.
Supply and installation of exhaust plenums and ductwork to dispose of dirty air from 40 AHUs. Plenum size 8.4m x 1.2m x 1.4m
Supply and installation of DW144 general supply and extract duct work to ground floor communication rooms.
CoNTRACT
LD6 Slough Berkshire UK
Commencement
Jan 2016
Completion
July 2016
REQUIREMENT
11,000m2